Mobile Plant Risk Exposure
& Cost of Inaction Platform
Risk Exposure Assessment

How much unmanaged mobile plant risk does your operation carry?

See your site's annual and lifetime mobile plant risk exposure and how it compares with your industry. Every assumption is adjustable. Benchmarks are from published WorkSafe data.

1

Site Profile

Scale of the operation and how often serious mobile plant incidents occur.

2

Cost Stack

What one serious incident costs. Defaults follow your sector; override any line and add a note for the board report.

Bird Exposure Model i
1 Serious Incident10 Minor Injuries30 Property Damage Events600 Near Misses

A modelling framework, not a prediction for your site.

3

Annual Exposure Drivers

Costs carried every year alongside incident clusters. Both flow directly into annual exposure.

Absenteeism, overtime and supervision time linked to mobile plant risk. Replace with your figure.
Enforcement & Fines Exposure i
WorkSafe Victoria 2023 average across 153 successful prosecutions.
0.25% · 0.50% · 2.00% (min · mode · max)
WorkSafe Victoria: 0.5% of workplace visits led to prosecution. Applied per serious incident, the 1% mode is an assumption.
4

Strategic Exposure

Your own business case data: costs a serious incident causes that never appear in claims. Overlap with hard costs is removed, any driver switched off is excluded, and results are shown separately from the headline return.

Custom Drivers (optional)

Add drivers specific to your operation, such as contract eligibility or customer audits.

Mobile Plant Risk Exposure Assessment

Total mobile plant risk exposure i
$0
Annual exposure i
$0
Strategic exposure i
$0
Customer-entered, not in the headline figures
Potentially avoidable exposure i
$0
Avoidable per year
$0
Executive assessment
01
Exposure composition

Where the exposure comes from

Insight summary

02
Cost of doing nothing

What happens if nothing changes

Left unmanaged, exposure accumulates every year.

Insight summary

03
Value opportunity

How much value could be captured

The value effective mobile plant control could capture.

Avoidable exposure
$0
Avoidable per year
$0
Strategic avoidable per year
$0
Combined Exposure
$0

Insight summary

04
Industry position

How this site compares

—
Insight summary

05
Confidence and methodology

How these numbers are calculated

Insight summary

Model Settings

Adjust asset life and simulation ranges. Results update as you change them.

7 yrs
5 to 10 years; 7 by default.
Advanced — simulation distributions (triangular)
VariableMinModeMaxUnit

Download the board-ready report

A branded A4 report for your executive team or board, including ROI and appendices.

LOCKED

Board Report download

Includes ROI and Appendices A to C. Free with your company email.

LOCKED

Statistical appendix

Distribution, percentiles, sensitivity, segmentation and sources. Free with your company email.

Statistical appendix — distribution, percentiles, sensitivity and segmentation

Also included in the report appendices.

Simulated distribution of annual exposure

Percentile outputs

Sensitivity — swing in annual avoidable value

Exposure segmentation i

Methodology, assumptions & sources

ROI & Investment Analysis · Statistical Appendix · Model Settings · Full Board Report

Build the business case behind your risk exposure.

Your assessment is free. Register with your company email to add ROI analysis, customise model settings, open the statistical appendix and download the Board Report.

01 ROI analysisNet benefit, ROI, payback
02 Customise model settingsAsset life, simulation ranges, assumptions
03 AppendixMethod and sources
04 Board Report PDFDownload, with ROI and appendices

Instant access. Company email required. Marketing emails only if you tick the box.

Methodology at a glance

  • Monte Carlo simulation (10,000 runs) gives a range, not a single figure.
  • Every assumption is adjustable.
  • A 5 to 10-year horizon, 7 years by default.
  • Defaults from Safe Work Australia and WorkSafe Victoria; sources are in the appendix.

Indicative estimate only. This is not safety, legal or financial advice, a quote or a guarantee of outcomes.

5

ROI & Investment Analysis Optional

Enter figures from your SonaSafe proposal to see net benefit, ROI and payback. Leave blank to keep the assessment exposure-only.

One-time. $0 – $10,000,000.
Recurring. $0 – $1,000,000.
Calculate exposure, then enter your proposal costs to see the return.